Risk: Low Substation Operational

Encore Recycling Substation - 115 kV Operational Substation in the United States

United States

Overview

Encore Recycling Substation is an operational electrical substation located in the United States, operating at 115 kV. It plays a role in the regional grid near coordinates 33.732497, -84.111890.

Encore Recycling Substation is an operational electrical substation located in the United States. The facility operates at a voltage of 115 kV, which is typical for sub-transmission or distribution-level infrastructure, serving to step down power for local distribution or industrial use. Its location near coordinates 33.732497, -84.111890 places it in the southeastern United States, likely serving the Atlanta metropolitan area or surrounding regions. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which set reliability standards for the bulk power system. As a 115 kV facility, it is part of the sub-transmission network, connecting higher-voltage transmission lines to distribution systems. The equipment likely includes circuit breakers, transformers, and switchgear compliant with standards such as IEEE C37 for high-voltage switchgear. This substation supports grid stability and reliability by facilitating the efficient transfer of electricity from transmission to distribution networks. Its operational status ensures continued service to local communities and industries, contributing to the resilience of the regional electrical infrastructure. The facility's role is critical for maintaining power quality and meeting demand in its service area.

Environmental context

The substation is located in a region with a humid subtropical climate, which can affect equipment performance and maintenance schedules. The area is characterized by urban and suburban development, with potential for vegetation management to prevent outages. The 115 kV voltage level indicates a moderate scale of infrastructure, with environmental considerations including electromagnetic field management and oil containment for transformers.

Frequently asked questions

Encore Recycling Substation is located in the United States at coordinates 33.732497, -84.111890, likely in the southeastern region near Atlanta, Georgia.

Encore Recycling Substation operates at a voltage of 115 kV, which is typical for sub-transmission or distribution-level substations.

Encore Recycling Substation is currently operational, meaning it is actively serving the electrical grid.

Substations in the United States are regulated by NERC reliability standards and FERC for transmission-level assets, with equipment standards such as IEEE C37 for switchgear.

A 115 kV substation typically steps down voltage from higher transmission levels (e.g., 230 kV) to distribution levels (e.g., 12 kV), serving local industrial, commercial, and residential loads.
UtilityRadar
More
Press Esc to close · Browse by sector