Risk: Medium Substation Operational

Enid Substation - Electrical Substation in Enid, Oklahoma, United States

United States

Overview

Enid Substation is an operational electrical substation in Enid, Oklahoma, United States, handling voltages of 138 kV and 69 kV for grid stability.

Enid Substation is an operational electrical substation located in Enid, Oklahoma, United States. It serves as a key node in the regional power grid, stepping down transmission-level voltages for local distribution. The facility is part of the broader North American electrical infrastructure, which is regulated by NERC reliability standards and FERC oversight. The substation operates at voltage levels of 138 kV and 69 kV, typical for sub-transmission and distribution applications. These voltage levels indicate a medium-scale facility that connects high-voltage transmission lines to lower-voltage distribution networks. In the United States, such substations are critical for maintaining grid reliability and are subject to NERC's Critical Infrastructure Protection (CIP) standards. Enid Substation plays a vital role in supplying electricity to the Enid area, supporting residential, commercial, and industrial consumers. Its operational status ensures continued grid stability in north-central Oklahoma. The facility's location in a region prone to severe weather, including tornadoes, underscores the importance of robust infrastructure and emergency response planning.

Environmental context

The substation is situated in a rural-to-suburban area of north-central Oklahoma, a region characterized by flat plains and a continental climate with hot summers and cold winters. The local environment is influenced by agricultural activities and occasional severe weather events. Electrical infrastructure in this area must be designed to withstand high winds and ice storms, which can impact grid reliability.

Frequently asked questions

Enid Substation is located in Enid, Oklahoma, United States, at coordinates 36.370232, -97.875044.

Enid Substation operates at 138 kV and 69 kV, which are typical for sub-transmission and distribution applications.

The operator of Enid Substation is not publicly listed, but it is part of the US electrical grid regulated by NERC and FERC.

Enid Substation must comply with NERC reliability standards and FERC regulations, including Critical Infrastructure Protection (CIP) standards for cybersecurity and physical security.

Substations like Enid step down high transmission voltages to lower distribution voltages, ensuring safe and reliable electricity delivery to homes and businesses.