Risk: Medium Substation Operational

Faircrest Substation - High-Voltage Electrical Substation in the United States

United States

Overview

Faircrest Substation is an operational electrical substation in the United States, operating at 345 kV. It plays a key role in regional grid stability and power transmission.

Faircrest Substation is an operational electrical substation located in the United States, with coordinates 40.742922, -81.337670. Operating at a voltage of 345 kV, it is classified as a high-voltage substation, essential for transmitting electricity over long distances and maintaining grid reliability. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which set standards for bulk power system reliability. At 345 kV, Faircrest Substation is a key node in the transmission network, typical of large-scale infrastructure that interconnects generation sources with distribution systems. As part of the U.S. electrical grid, Faircrest Substation supports the delivery of electricity to residential, commercial, and industrial consumers. Its operational status ensures continued stability and resilience of the local power supply, contributing to the overall efficiency and security of the national grid.

Environmental context

The substation is located in a region with a mix of urban and rural areas, typical of the Midwest United States. High-voltage substations like Faircrest are designed to minimize environmental impact through careful siting and use of insulated equipment. The surrounding area may include agricultural or residential land, with the substation's footprint limited to the facility itself. Electromagnetic fields are managed within regulatory limits, and the site is maintained to prevent soil or water contamination.

Frequently asked questions

Faircrest Substation is located in the United States at coordinates 40.742922, -81.337670, likely in the state of Ohio.

Faircrest Substation operates at 345 kV, which is a high-voltage level used for long-distance power transmission.

Faircrest Substation is currently operational, meaning it is actively used in the electrical grid.

As a US substation, Faircrest operates under NERC reliability standards and FERC regulations, ensuring grid stability and compliance.

A 345 kV substation steps down high-voltage electricity from transmission lines to lower voltages for distribution, enabling efficient power delivery to consumers.
UtilityRadar
More
Press Esc to close · Browse by sector