Overview
Filer City is a 138 kV substation in Michigan, United States, operated by ITC. It plays a role in regional grid stability under NERC and FERC reliability standards.
Filer City is a substation located in Michigan, United States, operating at 138 kV. It is owned and operated by ITC, a major independent transmission company. The substation is part of the regional electrical infrastructure supporting power distribution in the area. As a 138 kV facility, Filer City operates at a sub-transmission voltage level typical for regional distribution networks. It falls under the regulatory oversight of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for bulk power systems. The substation likely employs standard switchgear and automation technologies consistent with ISO/IEC 61850 protocols. The substation contributes to grid reliability and power delivery in its region. Its location in Michigan places it within the Midcontinent Independent System Operator (MISO) footprint, which coordinates regional transmission planning and market operations. The facility supports local load demands and helps maintain voltage stability.
Environmental context
The substation is situated in a rural area of western Michigan, near Lake Michigan. Its operation involves electromagnetic fields and potential impacts on local wildlife, though modern substations are designed to minimize ecological disruption. The surrounding region has a mix of agricultural and forested land, with seasonal weather patterns that require robust infrastructure to maintain grid reliability.
Frequently asked questions
Filer City substation is located in Michigan, United States, near the coordinates 44.2171 N, -86.2885 W.
Filer City substation operates at 138 kV, a sub-transmission voltage level commonly used for regional power distribution.
Filer City substation is owned and operated by ITC, an independent transmission company in the United States.
Filer City substation operates under NERC reliability standards and FERC regulations, which govern the reliability and security of the U.S. bulk power system.
Filer City substation helps maintain voltage stability and power delivery within the MISO regional transmission network, supporting local load demands.