First Ave is an operational substation in the United States, located at coordinates 44.832226, -87.377536. It plays a role in the regional electrical grid, contributing to power distribution and grid stability.

First Ave is a substation located in the United States, operating within the country's extensive electrical infrastructure network. The facility is situated at coordinates 44.832226, -87.377536, placing it in a region that supports local power distribution and grid connectivity. As an operational substation, it is part of the broader system that transmits and distributes electricity from generation sources to end users. Substations in the United States are subject to regulatory oversight by the Federal Energy Regulatory Commission (FERC) for transmission-level assets and must comply with North American Electric Reliability Corporation (NERC) reliability standards. These frameworks ensure grid stability, voltage control, and protection against outages. The facility's technical specifications, such as voltage level, are not detailed, but typical substations in this region operate at medium to high voltages to serve industrial, commercial, and residential loads. The environmental and operational significance of First Ave lies in its role within the local grid, supporting energy reliability and resilience. Substations like this one are critical for managing power flow, transforming voltages, and isolating faults. Its location in the United States means it operates under stringent regulatory standards that prioritize safety and reliability, contributing to the overall stability of the electrical infrastructure in the area.

Environmental context

The substation is located in a region with a temperate climate, which influences electrical infrastructure design and maintenance. Seasonal temperature variations and weather events, such as storms, can impact grid reliability. Its coordinates suggest a location in Wisconsin, near Lake Michigan, where environmental factors like humidity and corrosion may affect equipment longevity. Proper insulation and maintenance are essential to ensure continuous operation.

Frequently asked questions

First Ave substation is located in the United States at coordinates 44.832226, -87.377536, which is in Wisconsin near Lake Michigan.

First Ave substation is currently operational, meaning it is actively involved in the transmission and distribution of electricity.

Substations in the United States are regulated by the Federal Energy Regulatory Commission (FERC) for transmission assets and must comply with North American Electric Reliability Corporation (NERC) reliability standards to ensure grid stability and security.

A substation transforms voltage levels, routes power, and provides protection and control functions within the electrical grid, ensuring efficient and reliable electricity delivery from generation to consumers.

First Ave substation contributes to grid reliability by facilitating voltage regulation, power flow management, and fault isolation, helping to maintain stable electricity supply in its region.