Substation Operational

Flatwood Substation - CLECO Electrical Substation in Louisiana

United States

Overview

Flatwood Substation is an operational electrical substation in Louisiana, United States, owned and operated by CLECO. It operates at 34.5 kV, serving the local grid.

Flatwood Substation is an electrical substation located in Louisiana, United States, and is owned and operated by CLECO. The facility is operational and plays a role in the regional power distribution network, stepping down voltage for local consumption. The substation operates at a voltage of 34.5 kV, which is typical for distribution-level substations that serve industrial, commercial, and residential areas. As part of CLECO's infrastructure, it is subject to North American Electric Reliability Corporation (NERC) reliability standards and Federal Energy Regulatory Commission (FERC) regulations for grid stability and safety. This substation contributes to the reliability of electricity supply in the region, supporting CLECO's service area in Louisiana. Its operational status ensures continued power delivery to local communities, and its integration into the broader grid helps maintain system balance and resilience.

Environmental context

The substation is located in a rural area of Louisiana, where the surrounding environment includes forests and agricultural land. Electrical infrastructure in such settings must consider potential impacts on local wildlife and vegetation, particularly during construction and maintenance. The 34.5 kV voltage level indicates a distribution role, which typically has lower environmental footprint compared to high-voltage transmission lines.

Frequently asked questions

Flatwood Substation is located in Louisiana, United States, at coordinates 31.408510, -92.852988.

Flatwood Substation operates at a voltage of 34.5 kV, which is typical for distribution-level substations.

Flatwood Substation is owned and operated by CLECO, a utility company serving parts of Louisiana.

As part of the U.S. electrical grid, Flatwood Substation must comply with NERC reliability standards and FERC regulations for safe and reliable operation.

A 34.5 kV substation typically steps down transmission voltage for distribution to local customers, serving as a critical node in the power delivery network.
UtilityRadar
More
Press Esc to close · Browse by sector