Risk: Low Substation Operational

Flint Hill Substation - Operational Electrical Substation in the United States

United States

Overview

Flint Hill Substation is an operational electrical substation in the United States, operating at 34.5 kV. It plays a role in regional grid stability and power distribution.

Flint Hill Substation is an operational electrical substation located in the United States, with coordinates 38.755790, -78.105908. The facility operates at a voltage of 34.5 kV, classifying it as a medium-voltage substation typical for distribution-level infrastructure. As part of the U.S. electrical grid, it supports local power distribution and grid reliability. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for transmission and distribution assets. The voltage level suggests it serves a local distribution network, likely in a rural or suburban area. Flint Hill Substation contributes to the resilience of the regional electrical infrastructure by ensuring stable voltage levels and facilitating power flow to end users. Its operational status indicates ongoing maintenance and compliance with grid standards, supporting community energy needs and economic activity.

Environmental context

The substation is located in a region with a mix of rural and suburban land use, which influences its environmental context. Electrical infrastructure like Flint Hill Substation can impact local ecosystems through electromagnetic fields and land use, though modern designs minimize such effects. The surrounding area's climate and vegetation may affect maintenance cycles and vegetation management practices.

Frequently asked questions

Flint Hill Substation is located in the United States at coordinates 38.755790, -78.105908.

Flint Hill Substation operates at a voltage of 34.5 kV, which is typical for distribution-level substations.

Flint Hill Substation is currently operational, indicating it is actively serving the electrical grid.

As a U.S. electrical substation, Flint Hill Substation must comply with NERC reliability standards and FERC regulations for grid stability and safety.

A 34.5 kV substation typically steps down transmission-level voltage for local distribution, serving residential, commercial, and industrial customers.
UtilityRadar
More
Press Esc to close · Browse by sector