Overview
Flint River Substation is an operational electrical substation owned by Georgia Power in the United States. It operates at 46 kV, serving the regional grid.
Flint River Substation is an electrical substation located in the United States, owned and operated by Georgia Power. The facility operates at a voltage of 46 kV, classifying it as a distribution-level substation that steps down power for local distribution networks. As part of Georgia Power's infrastructure, this substation falls under the regulatory oversight of the Federal Energy Regulatory Commission (FERC) and must comply with North American Electric Reliability Corporation (NERC) reliability standards. The 46 kV voltage level is typical for sub-transmission or distribution applications, serving industrial, commercial, and residential loads in the surrounding area. The substation plays a critical role in maintaining grid stability and reliability for the region. Its operational status ensures continued power delivery to customers, supporting local economic activity and community needs. Georgia Power's extensive network of substations like Flint River contributes to the overall resilience of the Southeastern US electric grid.
Environmental context
The substation is situated in a region with a humid subtropical climate, which can impact equipment performance and maintenance schedules. Its location near the Flint River may require environmental considerations for stormwater management and flood risk. The facility's design and operation likely incorporate measures to minimize electromagnetic field exposure and ensure compliance with environmental regulations.
Frequently asked questions
Flint River Substation is located in the United States, near the Flint River, with coordinates 31.603588, -84.137805.
Flint River Substation operates at a voltage of 46 kV, which is typical for distribution-level substations.
Flint River Substation is owned and operated by Georgia Power, a major electric utility in the United States.
As part of the US electrical grid, Flint River Substation must comply with NERC reliability standards and FERC regulations for grid stability and safety.
A 46 kV substation typically steps down transmission-level voltage for distribution to industrial, commercial, and residential customers, ensuring reliable local power supply.