Risk: Low Substation Operational

Fork Creek Substation - 138 kV Electrical Substation in Texas, United States

United States

Overview

Fork Creek Substation is an operational electrical substation in Texas, United States, owned by SHECO. It operates at a voltage of 138 kV, serving as a key node in the regional power grid.

Fork Creek Substation is an operational electrical substation located in Texas, United States, owned and operated by SHECO. The facility operates at a voltage level of 138 kV, which classifies it as a medium-to-high voltage substation typical of sub-transmission or distribution-level infrastructure in the US grid. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which set reliability standards for the bulk power system. As a 138 kV facility, it likely incorporates modern substation automation technologies such as IEC 61850 for communication and control, enhancing grid stability and monitoring capabilities. Located in a rural area of Texas, Fork Creek Substation plays a critical role in distributing power to local communities and industries. Its operational status ensures continued reliability for the surrounding region, contributing to the overall resilience of the Texas Interconnection grid.

Environmental context

The substation is situated in a rural area of Texas, where the local environment includes pine forests and wetlands. The facility's 138 kV operation is typical for sub-transmission lines that traverse such landscapes, with minimal direct environmental impact. Standard practices for substations in this region include vegetation management and stormwater control to mitigate runoff.

Frequently asked questions

Fork Creek Substation is located in Texas, United States, near coordinates 30.883281, -94.293719.

Fork Creek Substation operates at a voltage of 138 kV, which is a common sub-transmission voltage level in the United States.

Fork Creek Substation is owned and operated by SHECO, a utility company in the region.

As part of the US bulk power system, Fork Creek Substation must comply with NERC reliability standards and FERC regulations, ensuring grid stability and security.

A 138 kV substation typically steps down transmission-level voltage for distribution to local networks, serving as a critical node for regional power delivery and grid reliability.
UtilityRadar
More
Press Esc to close · Browse by sector