Overview
Fort King Substation is an operational electrical substation in Florida, United States, operated by TECO. It operates at 69 kV, serving as a key node in the regional power grid.
Fort King Substation is an operational electrical substation located in Florida, United States, and operated by Tampa Electric Company (TECO). The facility operates at a voltage of 69 kV, classifying it as a medium-voltage substation that plays a role in distributing electricity from transmission lines to local distribution networks. As part of the U.S. electrical infrastructure, Fort King Substation operates under the regulatory framework established by the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These bodies enforce reliability standards and oversee interstate electricity transmission. The substation's equipment likely includes circuit breakers, transformers, and switchgear compliant with IEEE and ANSI standards, typical for facilities of this voltage class. The substation's location in Florida places it within a region prone to hurricanes and tropical storms, which can pose risks to grid stability. TECO, the operator, implements storm hardening measures and vegetation management to enhance resilience. Fort King Substation contributes to the reliable delivery of electricity to residential, commercial, and industrial customers in the Tampa Bay area, supporting the local economy and community.
Environmental context
The substation is situated in a region with a subtropical climate, characterized by high humidity and frequent lightning strikes, which can affect equipment reliability. Florida's flat terrain and proximity to the coast also expose the facility to potential flooding from storm surges. The surrounding area is a mix of urban and suburban development, with natural habitats including wetlands and pine flatwoods. The substation's operation involves minimal direct environmental impact, but its role in grid stability is critical for supporting renewable energy integration and reducing reliance on fossil fuels.
Frequently asked questions
Fort King Substation is located in Florida, United States, at coordinates 28.333646, -82.204467. It is operated by Tampa Electric Company (TECO).
Fort King Substation operates at a voltage of 69 kV, which is a medium-voltage level used for subtransmission and distribution in the US power grid.
Fort King Substation is operated by TECO (Tampa Electric Company), a utility serving the Tampa Bay area in Florida.
US substations must comply with NERC reliability standards and FERC regulations for transmission-level assets. Equipment often follows IEEE and ANSI standards, including IEC 61850 for substation automation.
A 69 kV substation steps down voltage from higher transmission lines (e.g., 138 kV or 230 kV) for distribution to local networks, serving industrial, commercial, and residential customers.