Substation Operational

Georgia Iron Works Substation - Electrical Substation in Georgia, United States

United States

Overview

Georgia Iron Works Substation is an operational electrical substation in Georgia, United States, owned by Georgia Power. It operates at 115 kV and 12 kV, serving the local grid.

Georgia Iron Works Substation is an operational electrical substation located in Georgia, United States. Owned and operated by Georgia Power, a major utility in the region, this facility plays a key role in the state's electrical infrastructure. The substation handles voltage levels of 115 kV and 12 kV, indicating its function in both transmission and distribution. The substation operates under the regulatory framework of the United States, which includes NERC reliability standards and FERC oversight for transmission assets. Georgia Power, as part of the Southern Company, adheres to these standards to ensure grid stability and reliability. The facility's voltage levels suggest it serves as a step-down substation, connecting high-voltage transmission lines to lower-voltage distribution networks. Located in the Augusta area, the substation supports the electrical needs of the surrounding community and industrial users. Its operational status and integration into the broader grid highlight its importance in maintaining consistent power supply. The facility's presence contributes to the resilience of the local electrical infrastructure.

Environmental context

The substation is situated in a region with a humid subtropical climate, which can affect equipment performance and maintenance schedules. Its urban location near Augusta means it supports a mix of residential, commercial, and industrial loads. The facility's age and technology are typical for substations in the area, with standard switchgear and protection systems.

Frequently asked questions

Georgia Iron Works Substation is located in Georgia, United States, near Augusta. Its coordinates are approximately 33.46° N, -82.19° W.

The substation operates at 115 kV and 12 kV, indicating it handles both transmission and distribution voltages.

The substation is owned by Georgia Power, a subsidiary of Southern Company and a major electric utility in the southeastern United States.

Substations in the US must comply with NERC reliability standards for grid stability and FERC regulations for transmission assets. Additionally, ISO/IEC 61850 standards for substation automation are commonly adopted.

As a step-down substation, it connects high-voltage transmission lines to lower-voltage distribution networks, supplying electricity to residential, commercial, and industrial customers in the Augusta area.
UtilityRadar
More
Press Esc to close · Browse by sector