Risk: Medium Substation Operational

Gerald Eagle Substation - High-Voltage Electrical Substation in the United States

United States

Overview

Gerald Eagle Substation is an operational electrical substation in the United States, operating at 230 kV. It plays a key role in regional grid stability and power distribution.

Gerald Eagle Substation is an operational electrical substation located in the United States, with coordinates 29.229346, -82.078411. The facility operates at a voltage of 230 kV, classifying it as a high-voltage substation critical for transmission-level power distribution. As part of the U.S. electrical grid, it supports the reliable delivery of electricity to residential, commercial, and industrial consumers. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for bulk power systems. The 230 kV voltage level indicates its role in the transmission network, connecting generation sources to lower-voltage distribution systems. Typical substations at this scale include switchgear, transformers, and protection systems compliant with standards such as IEEE C37. Gerald Eagle Substation contributes to the resilience of the local electrical infrastructure by facilitating voltage regulation and load balancing. Its operational status ensures continued service to the surrounding region, supporting economic activity and community needs. The facility's location in the United States benefits from a mature regulatory environment focused on grid security and modernization.

Environmental context

The substation is situated in a region with a mix of urban and rural areas, where electrical infrastructure must balance reliability with environmental considerations. High-voltage substations like this one are typically designed with oil containment systems and noise mitigation to minimize local impact. The surrounding area may include sensitive ecosystems, requiring adherence to environmental regulations during maintenance and operation.

Frequently asked questions

Gerald Eagle Substation is located in the United States at coordinates 29.229346, -82.078411.

Gerald Eagle Substation operates at 230 kV, which is a high-voltage level used for transmission in the electrical grid.

Gerald Eagle Substation is currently operational, meaning it is actively functioning as part of the electrical infrastructure.

Substations in the United States must comply with NERC reliability standards and FERC regulations, ensuring grid stability and security.

A 230 kV substation steps down transmission voltage for distribution, enabling efficient long-distance power transfer and local delivery.