Substation Operational

Goltry Tap Substation - 69 kV Substation in the United States

United States

Overview

Goltry Tap Substation is an operational electrical substation in the United States, operating at 69 kV. It plays a role in regional grid stability and power distribution.

Goltry Tap Substation is an operational electrical substation located in the United States, with coordinates 36.538371, -98.122559. The facility operates at a voltage level of 69 kV, which classifies it as a sub-transmission or distribution-level substation, typical for serving local communities and industrial loads. As a substation in the United States, Goltry Tap Substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) reliability standards and Federal Energy Regulatory Commission (FERC) oversight for transmission-level assets. The 69 kV voltage level indicates it is part of the sub-transmission network, often connecting bulk power systems to distribution networks. Substations of this scale are critical for voltage regulation and load balancing in rural or suburban areas. The environmental context of this substation includes its location in a rural area of Oklahoma, where it supports agricultural and residential electricity needs. Substations like this are essential for maintaining grid reliability and enabling the integration of renewable energy sources, such as wind power, which is prevalent in the region. The facility's operational status ensures continued service to the local community.

Environmental context

The substation is located in a rural area of Oklahoma, where the primary environmental considerations include land use for agricultural purposes and potential impacts on local wildlife. The 69 kV voltage level suggests it serves a moderate-sized load area, with typical environmental management practices such as vegetation control and stormwater runoff management to minimize ecological disruption.

Frequently asked questions

Goltry Tap Substation is located in the United States, with approximate coordinates 36.538371, -98.122559, likely in the state of Oklahoma.

Goltry Tap Substation operates at a voltage of 69 kV, which is typical for sub-transmission or distribution-level substations.

Substations in the US are typically operated by local utilities or regional transmission organizations.

As a US substation, Goltry Tap Substation must comply with NERC reliability standards and FERC regulations, including requirements for grid reliability, cybersecurity, and maintenance.

A 69 kV substation serves as a sub-transmission node, stepping down voltage from higher transmission levels for distribution to local networks, and helps maintain voltage stability and load balancing.