Greens Cut Substation is an operational electrical substation in Georgia, United States, owned by Georgia Power. It operates at 115 kV, serving the local grid.
Greens Cut Substation is an operational electrical substation located in Georgia, United States. Owned by Georgia Power, a major utility in the region, this facility plays a role in the state's electrical infrastructure. The substation operates at a voltage of 115 kV, which is typical for sub-transmission and distribution-level assets in the US grid. As part of the US electrical infrastructure, Greens Cut Substation operates under the regulatory framework established by the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These standards ensure grid reliability and security for transmission and sub-transmission assets. The substation likely includes modern switchgear and protection systems compliant with industry standards. The substation's location in Georgia supports the regional grid stability and power distribution for surrounding communities. Its operational status indicates ongoing contribution to the local electrical network, facilitating reliable electricity supply. The facility's role is integral to the broader Southeastern US power system.
Environmental context
The substation is situated in a rural or suburban area of Georgia, where electrical infrastructure supports both residential and industrial loads. The 115 kV voltage level indicates it is part of the sub-transmission network, which connects bulk power systems to distribution networks. Environmental considerations for such facilities include electromagnetic field management, vegetation clearance for rights-of-way, and stormwater runoff control to protect local waterways.
Frequently asked questions
Greens Cut Substation is located in Georgia, United States, at coordinates 33.194507, -81.968408.
Greens Cut Substation is owned by Georgia Power, a major electric utility serving the state of Georgia.
Greens Cut Substation operates at 115 kV, which is a common voltage level for sub-transmission and distribution substations in the United States.
As part of the US electrical grid, Greens Cut Substation must comply with NERC reliability standards and FERC regulations for grid stability and security.
A 115 kV substation typically steps down voltage from higher transmission levels for distribution to local networks, serving residential, commercial, and industrial customers.