Overview
Hearne Substation, operated by Brazos Electric in Texas, is an operational substation handling voltages of 138 kV and 69 kV, serving the local electrical grid.
Hearne Substation is an electrical substation located in Hearne, Texas, United States, operated by Brazos Electric. It is part of the regional transmission and distribution network, handling primary voltages of 138 kV and 69 kV, which indicates its role in stepping down high-voltage transmission to sub-transmission levels for local distribution. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which set reliability standards for the bulk power system. As a substation in the ERCOT interconnection, it must comply with Texas-specific grid reliability requirements. The facility's voltage levels suggest it is a medium-scale substation typical of rural or suburban areas, supporting both industrial and residential loads. Environmentally, the substation is located in a rural area of Robertson County, with the surrounding landscape primarily agricultural. Its operation is critical for maintaining grid stability in the region, especially during peak demand periods. Its continued operational status indicates ongoing maintenance and compliance with safety standards.
Environmental context
The substation is situated in a rural area of central Texas, characterized by agricultural land and scattered residential communities. The local climate includes hot summers and mild winters, which can influence electricity demand patterns. The facility's voltage levels and location suggest it plays a role in distributing power to agricultural operations and small towns, with potential environmental considerations related to electromagnetic fields and land use.
Frequently asked questions
Hearne Substation is located in Hearne, Texas, United States, at coordinates 30.884127, -96.625919.
Hearne Substation operates at voltages of 138 kV and 69 kV, typical for sub-transmission and distribution substations.
Hearne Substation is operated by Brazos Electric, a generation and transmission cooperative in Texas.
The substation must comply with NERC reliability standards and FERC regulations, as well as ERCOT's grid reliability requirements for the Texas interconnection.
Substations like Hearne step down high-voltage transmission power to lower voltages for local distribution, ensuring stable and reliable electricity supply to homes, businesses, and industries.