Overview

Highview Substation is an operational electrical substation in New Richmond, Wisconsin, operated by New Richmond Utilities. It operates at 69 kV, serving the local grid.

Highview Substation is an operational electrical substation located in New Richmond, Wisconsin, United States. Owned and operated by New Richmond Utilities, it plays a key role in the local electrical infrastructure. The substation operates at a voltage of 69 kV, which is typical for distribution-level substations serving smaller communities. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which set reliability standards for the bulk power system. As a municipal utility asset, it is subject to state-level oversight by the Public Service Commission of Wisconsin. The 69 kV voltage level indicates it primarily serves local distribution needs, stepping down power from higher transmission voltages. Highview Substation is critical for maintaining grid stability in the New Richmond area. Its operational status ensures reliable electricity supply to residential, commercial, and industrial customers. The substation's location in a rural-urban transition zone highlights its role in supporting community growth and energy resilience.

Environmental context

The substation is situated in a mixed rural-urban area in western Wisconsin, near the Apple River. Its operation involves electromagnetic fields and potential oil leakage from transformers, though modern containment measures mitigate risks. The surrounding landscape includes agricultural fields and residential developments, making vegetation management and wildlife protection relevant for operational safety.

Frequently asked questions

Highview Substation is located in New Richmond, Wisconsin, United States, at coordinates 45.111869, -92.519181.

Highview Substation operates at 69 kV, a standard voltage for distribution-level substations in the United States.

Highview Substation is operated by New Richmond Utilities, a municipal utility serving the New Richmond area.

As part of the US electrical grid, Highview Substation must comply with NERC reliability standards and FERC regulations, along with state oversight from the Public Service Commission of Wisconsin.

A 69 kV substation steps down higher transmission voltages for local distribution, ensuring reliable electricity supply to residential, commercial, and industrial customers in the area.