Risk: Low Substation Operational

Hillview Substation - Operational 115 kV Substation in Oregon, United States

United States

Overview

Hillview Substation is an operational electrical substation in Oregon, United States, operated by Pacific Power. It operates at 115 kV, serving the local grid.

Hillview Substation is an operational electrical substation located in Oregon, United States, and operated by Pacific Power. The facility operates at a voltage of 115 kV, placing it within the sub-transmission voltage class typical for regional distribution networks. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which set reliability standards for the bulk power system. As part of Pacific Power's infrastructure, it adheres to NERC's Critical Infrastructure Protection (CIP) standards for cybersecurity and physical security. The 115 kV voltage level is common for substations that step down power from higher transmission voltages to distribution levels. Hillview Substation plays a key role in maintaining grid stability and reliability for the surrounding area. Its location in Oregon, a state with a mix of hydroelectric, wind, and solar generation, supports the integration of renewable energy sources into the grid. The substation's operational status ensures continued service to local communities and industries.

Environmental context

The substation is situated in Oregon, a region with diverse geography including forests and agricultural lands. Electrical infrastructure like Hillview Substation is designed to minimize environmental impact through proper siting and maintenance practices. The 115 kV voltage level indicates a moderate scale of infrastructure, typically associated with lower electromagnetic field exposure compared to higher voltage lines.

Frequently asked questions

Hillview Substation is located in Oregon, United States, at coordinates 44.546029, -123.312577.

Hillview Substation is operated by Pacific Power, a utility company serving the western United States.

Hillview Substation operates at a voltage of 115 kV, which is typical for sub-transmission and distribution substations.

As part of the US electrical grid, Hillview Substation must comply with NERC reliability standards and FERC regulations, including CIP standards for cybersecurity.

A 115 kV substation steps down high-voltage transmission power to lower voltages for distribution to homes and businesses, ensuring reliable electricity supply.