Substation Operational

Holtec Substation - Operational Electrical Substation in the United States

United States

Overview

Holtec Substation is an operational electrical substation in the United States, operating at 69 kV. It plays a role in regional grid stability and power distribution.

Holtec Substation is an operational electrical substation located in the United States, with coordinates 39.913230, -75.118587. The facility operates at a voltage of 69 kV, classifying it as a medium-voltage substation typical of distribution-level infrastructure. As part of the U.S. electrical grid, it supports local power distribution and grid reliability. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for transmission and distribution assets. The 69 kV voltage level indicates a role in sub-transmission or distribution, often serving industrial or urban load centers. Holtec Substation contributes to the resilience of the regional electrical network by stepping down voltage for local distribution. Its location in the northeastern United States places it within a densely populated and industrially active area, where reliable power supply is critical for economic activity and community services. The substation's operational status ensures continued support for grid stability and energy delivery.

Environmental context

The substation's location in the northeastern United States places it in a region with mixed urban and suburban land use. Electrical infrastructure at this voltage level typically has a localized environmental footprint, including electromagnetic fields and land use for equipment. The facility's age and maintenance practices can influence its environmental impact, but no specific data on these factors is available. The surrounding area likely includes residential and commercial zones, where substations are integrated into the landscape with minimal direct ecological disruption.

Frequently asked questions

Holtec Substation is located in the United States at coordinates 39.913230, -75.118587, likely in the northeastern region.

Holtec Substation operates at 69 kV, a medium voltage typical for sub-transmission or distribution networks.

As part of the U.S. electrical grid, Holtec Substation is subject to NERC reliability standards and FERC oversight for transmission-level assets.

A 69 kV substation typically steps down voltage from higher transmission lines for local distribution, serving industrial, commercial, and residential customers.

By maintaining operational status and stable voltage levels, Holtec Substation supports local power distribution and helps prevent outages in its service area.