Overview
Ida Grove Wind Farm is a substation in Iowa, United States, operated by MidAmerican Energy. It handles voltages of 345 kV and 34.5 kV, supporting wind energy transmission.
Ida Grove Wind Farm is a substation located in Iowa, United States, operated by MidAmerican Energy. The facility plays a key role in collecting and transmitting power from wind turbines, with voltage levels of 345 kV and 34.5 kV, indicating its function as a step-up substation for grid integration. As part of the U.S. electrical infrastructure, this substation operates under NERC reliability standards and FERC regulations for transmission-level assets. The 345 kV voltage class is typical for high-voltage transmission, connecting wind farms to the bulk power system. MidAmerican Energy, a major utility in the Midwest, manages this facility to ensure stable grid operation and renewable energy delivery. The substation's location in rural Iowa supports the region's growing wind energy sector, contributing to grid stability and clean energy goals. Its operational status ensures continuous power flow from the Ida Grove Wind Farm to the wider electrical network, serving both local and regional demand.
Environmental context
The substation is situated in a rural agricultural area of Iowa, a state with significant wind energy development. The surrounding landscape consists of farmland and open plains, which are conducive to wind power generation. The facility's operation supports renewable energy integration, reducing reliance on fossil fuels and contributing to lower carbon emissions in the region.
Frequently asked questions
Ida Grove Wind Farm is located in Iowa, United States, near the coordinates 42.363967, -95.379674.
It is a substation that collects electricity from wind turbines and steps up the voltage to 345 kV for transmission onto the high-voltage grid.
The substation is operated by MidAmerican Energy, a utility company serving customers in the Midwest.
As part of the U.S. electrical grid, it must comply with NERC reliability standards and FERC regulations for transmission infrastructure.
The substation handles voltages of 345 kV and 34.5 kV, typical for connecting wind farms to the transmission network.