IDLE HOUR is a 69 kV substation located in the United States, operating as a key node in the regional electrical grid. It supports power distribution and grid stability in the area.
IDLE HOUR is a substation facility located in the United States, with coordinates 42.620148, -89.641772. It operates at a voltage level of 69 kV, which is typical for sub-transmission or distribution substations that step down power from higher transmission voltages for local distribution. The facility is currently operational and plays a role in the electrical infrastructure of the region. As a substation in the United States, IDLE HOUR operates under the regulatory framework established by the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These bodies enforce reliability standards for the bulk power system, including substation equipment, protection systems, and cybersecurity. The 69 kV voltage level places this facility in the sub-transmission category, often serving industrial or large commercial loads. The environmental context of IDLE HOUR includes its location in a rural or suburban area, as indicated by the coordinates. Substations at this voltage level typically have a moderate footprint and are designed to minimize visual and noise impacts. The facility contributes to grid resilience by providing voltage regulation and switching capabilities, supporting the reliable delivery of electricity to end users.
Environmental context
The IDLE HOUR substation is situated in a region with a mix of agricultural and residential land use. At 69 kV, the facility operates at a voltage level that typically requires moderate clearance and safety buffers. The substation's design likely includes measures to mitigate electromagnetic fields and noise, in compliance with local environmental regulations. Its role in the grid helps reduce transmission losses by stepping down voltage closer to load centers.
Frequently asked questions
IDLE HOUR substation is located in the United States at coordinates 42.620148, -89.641772, in a region with agricultural and residential land use.
IDLE HOUR substation operates at 69 kV, which is a common sub-transmission voltage level used for distributing power from higher voltage transmission lines to local distribution networks.
IDLE HOUR substation is currently operational, serving as an active node in the regional electrical grid.
Substations in the United States are subject to NERC reliability standards and FERC regulations, which cover equipment maintenance, protection systems, and cybersecurity to ensure grid stability.
A 69 kV substation typically steps down power from higher transmission voltages (e.g., 138 kV or 230 kV) for distribution to industrial, commercial, or residential areas, and may also provide voltage regulation and switching functions.