Risk: Low Substation Operational

Imerys Substation - 115 kV Operational Substation in the United States

United States

Overview

Imerys Substation is an operational electrical substation in the United States, operating at 115 kV. It plays a role in regional grid stability and power distribution.

Imerys Substation is an operational electrical substation located in the United States, with coordinates 32.183887, -84.117551. The facility operates at a voltage of 115 kV, which is typical for sub-transmission or distribution-level infrastructure, serving to step down power for local industrial or residential use. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for the bulk power system. As a 115 kV facility, it is likely part of a regional transmission or distribution network, subject to NERC's Critical Infrastructure Protection (CIP) standards for cybersecurity and physical security. This substation supports the electrical infrastructure of the surrounding area, contributing to grid reliability and power delivery. Its location in the southeastern United States places it within a region that experiences high electricity demand, particularly during summer months, making its operational status important for local energy security.

Environmental context

The substation is located in a rural or semi-rural area of Georgia, near the town of Vienna. The surrounding environment includes agricultural land and scattered woodlands. Electrical infrastructure in such settings typically has minimal direct environmental impact, though rights-of-way require vegetation management. The 115 kV voltage level suggests it serves local distribution needs, with lower electromagnetic field exposure compared to higher-voltage transmission lines.

Frequently asked questions

Imerys Substation is located in the United States, near coordinates 32.183887, -84.117551, in the state of Georgia, close to the town of Vienna.

Imerys Substation operates at a voltage of 115 kV, which is typical for sub-transmission or distribution-level electrical infrastructure.

As part of the U.S. bulk power system, Imerys Substation is subject to reliability standards set by the North American Electric Reliability Corporation (NERC) and enforced by the Federal Energy Regulatory Commission (FERC).

A 115 kV substation typically steps down transmission-level voltage for distribution to local industrial, commercial, or residential customers, and may also serve as a switching point for grid configuration.

Substations require vegetation management along rights-of-way and may involve oil containment for transformers. Electromagnetic fields (EMF) are typically low at 115 kV, and visual impact is minimized through design.