Risk: Medium Substation Operational

Jay Substation - 115 kV Electrical Substation in Florida, United States

United States

Overview

Jay Substation is an operational electrical substation in Florida, United States, owned by PowerSouth Energy Cooperative. It operates at 115 kV, serving the regional grid.

Jay Substation is an operational electrical substation located in Florida, United States. Owned by PowerSouth Energy Cooperative, the facility operates at a voltage of 115 kV, classifying it as a medium-voltage substation that plays a role in the regional transmission and distribution network. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which set reliability standards for the bulk power system. As a 115 kV facility, it is typical for sub-transmission or distribution-level infrastructure, supporting local load centers and industrial customers in the area. As part of PowerSouth Energy Cooperative's network, Jay Substation contributes to the reliable delivery of electricity to communities in the Florida Panhandle. Its operational status ensures continued grid stability and power supply for residential, commercial, and industrial users in the region.

Environmental context

The substation is located in a rural area of Florida, where the surrounding environment includes agricultural land and natural habitats. The 115 kV voltage level indicates moderate electromagnetic field exposure, which is managed through standard siting and shielding practices. The facility's operation is subject to environmental regulations that minimize impacts on local ecosystems and communities.

Frequently asked questions

Jay Substation is located in Florida, United States, at coordinates 30.938990, -87.166325.

Jay Substation operates at 115 kV, which is a medium voltage level commonly used for sub-transmission and distribution in the United States.

Jay Substation is owned by PowerSouth Energy Cooperative, a generation and transmission cooperative serving Alabama and Florida.

As part of the U.S. bulk power system, Jay Substation must comply with NERC reliability standards and FERC regulations for grid stability and safety.

A 115 kV substation steps down transmission voltage for local distribution or interconnects with other lines, ensuring reliable electricity supply to nearby communities and industries.