JC Edwards Substation - 161 kV Electrical Substation in Georgia, United States

United States

Overview

JC Edwards Substation is an operational electrical substation in Georgia, United States, owned and operated by North Georgia EMC. It operates at a voltage of 161 kV, serving the local grid.

JC Edwards Substation is an operational electrical substation located in Georgia, United States. Owned and operated by North Georgia EMC, the facility plays a key role in the regional power distribution network. With a voltage level of 161 kV, it is classified as a high-voltage substation, typical for transmission and sub-transmission applications in the U.S. grid. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for bulk power systems. As part of North Georgia EMC's infrastructure, it supports the cooperative's mission to deliver reliable electricity to member-consumers in the region. The 161 kV voltage level indicates its role in stepping down power from higher transmission voltages for local distribution. Environmentally, the substation's location in northern Georgia places it within a region characterized by rolling hills and a temperate climate. The facility's operation contributes to grid stability for surrounding communities, including residential and commercial areas. As an electrical substation, its environmental impact is primarily related to land use and electromagnetic fields, managed through standard siting and operational practices.

Environmental context

The substation is situated in northern Georgia, an area with a mix of urban and rural landscapes. The local environment includes forested hills and agricultural land, with the facility's footprint limited to the substation yard. Standard mitigation measures for substations include vegetation management and stormwater control to minimize ecological disruption.

Frequently asked questions

JC Edwards Substation is located in Georgia, United States, at coordinates 34.965239, -85.226166. It is owned and operated by North Georgia EMC.

JC Edwards Substation operates at a voltage of 161 kV, which is a common high-voltage level for sub-transmission and transmission applications in the U.S. power grid.

JC Edwards Substation is owned by North Georgia EMC, an electric membership cooperative serving customers in northern Georgia.

As part of the U.S. bulk power system, JC Edwards Substation must comply with NERC reliability standards and FERC regulations, ensuring grid stability and operational safety.

A 161 kV substation typically steps down high-voltage transmission power for local distribution, serving as a critical node in the electrical grid to deliver reliable electricity to residential, commercial, and industrial customers.