Overview
Jerome Substation is an operational electrical substation in Ohio, United States, operated by FirstEnergy. It operates at 69 kV, serving as a key node in the regional transmission grid.
Jerome Substation is an operational electrical substation located in Ohio, United States, and operated by FirstEnergy. The facility operates at a voltage of 69 kV, classifying it as a medium-voltage substation within the regional transmission network. As part of FirstEnergy's infrastructure, it plays a role in distributing electricity across the area. The substation is subject to regulatory oversight by the Federal Energy Regulatory Commission (FERC) and must comply with North American Electric Reliability Corporation (NERC) reliability standards. These standards ensure grid stability and security, including requirements for maintenance, cybersecurity, and emergency response. The 69 kV voltage level is typical for sub-transmission or distribution substations that connect to local distribution networks. Jerome Substation supports the electrical needs of the surrounding community and industrial users. Its location in Ohio places it within the PJM Interconnection, one of the largest regional transmission organizations in the United States. The substation's operational status contributes to the reliability of the local grid, facilitating power delivery to residential, commercial, and industrial customers.
Environmental context
The substation is located in a rural area of Ohio, surrounded by agricultural land and scattered residential developments. The 69 kV voltage level suggests it serves as a distribution substation, with lower environmental impact compared to high-voltage transmission lines. The site's operation involves standard electromagnetic fields and noise, which are managed within regulatory limits. The surrounding ecosystem includes farmland and woodlands, with potential considerations for wildlife corridors and vegetation management.
Frequently asked questions
Jerome Substation is located in Ohio, United States, near coordinates 40.788404, -82.185610. It is operated by FirstEnergy.
Jerome Substation operates at 69 kV (69,000 volts), which is a medium voltage level typical for sub-transmission or distribution substations.
Jerome Substation is operated by FirstEnergy, a major electric utility company serving customers in the Midwest and Mid-Atlantic regions of the United States.
As part of the U.S. electrical grid, Jerome Substation must comply with NERC reliability standards and FERC regulations. These standards cover grid stability, cybersecurity, and maintenance practices.
A 69 kV substation typically steps down voltage from higher transmission levels for distribution to local networks. It serves as a critical node for delivering electricity to residential, commercial, and industrial customers.