Overview

Johnnycake Substation is an operational electrical substation in the United States, operating at 115 kV. It plays a role in regional grid stability and power distribution.

Johnnycake Substation is an operational electrical substation located in the United States, with coordinates 44.731152, -93.184267. The facility operates at a voltage of 115 kV, classifying it as a medium-voltage substation typical of distribution-level infrastructure. Substations at this voltage level are critical for stepping down transmission voltages for local distribution networks. As a substation in the United States, Johnnycake Substation operates under the regulatory framework established by the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These entities enforce reliability standards for the bulk power system, ensuring that substations like this one maintain grid stability and security. The facility's 115 kV voltage level is common for subtransmission systems that serve industrial and urban areas. The environmental and operational significance of Johnnycake Substation lies in its role within the local power grid. It likely serves as a node for distributing electricity to residential, commercial, and industrial customers in the surrounding area. The substation's operational status indicates it is actively contributing to the reliability of the regional electrical infrastructure, supporting energy delivery and grid resilience.

Environmental context

The substation is located in a region with a temperate climate, which influences the design and maintenance of electrical equipment. The surrounding area is likely a mix of urban and suburban development, typical of the Minneapolis-Saint Paul metropolitan region. Substations in such settings must manage load demands from residential and commercial sectors, and their operation is subject to local environmental regulations regarding noise, electromagnetic fields, and stormwater management.

Frequently asked questions

Johnnycake Substation is located in the United States at coordinates 44.731152, -93.184267, likely within the Minneapolis-Saint Paul metropolitan area.

Johnnycake Substation operates at a voltage of 115 kV, which is typical for subtransmission and distribution-level substations.

Johnnycake Substation is currently operational, meaning it is actively functioning as part of the electrical grid.

Substations in the United States are regulated by NERC reliability standards and FERC oversight, ensuring grid stability and security.

A 115 kV substation typically steps down transmission voltages for local distribution, serving industrial, commercial, and residential customers.