Overview
Joplin Fir Road Substation is an operational electrical substation in Joplin, Missouri, United States, operating at 161 kV for regional grid stability.
Joplin Fir Road Substation is an operational electrical substation located in Joplin, Missouri, United States. The facility operates at a voltage of 161 kV, placing it in the high-voltage transmission category, which is critical for bulk power transfer and grid reliability in the region. As a substation in the United States, this facility operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These standards mandate reliability, cybersecurity, and maintenance protocols for transmission-level assets. The 161 kV voltage level is typical for sub-transmission or transmission applications, serving as a key node in the local power grid. The substation plays a vital role in distributing electricity to the Joplin area, supporting residential, commercial, and industrial loads. Its operational status ensures continued grid stability and power delivery, contributing to the region's energy infrastructure resilience.
Environmental context
The substation is located in Joplin, Missouri, a region with a temperate climate and occasional severe weather events such as thunderstorms and tornadoes. These conditions can impact grid reliability, making robust substation design and maintenance important. The facility's urban location means it serves a dense load center, requiring careful management of electromagnetic fields and noise in compliance with local regulations.
Frequently asked questions
Joplin Fir Road Substation is located in Joplin, Missouri, United States, at coordinates 37.142219, -94.523412.
Joplin Fir Road Substation operates at a voltage of 161 kV, which is typical for high-voltage transmission and sub-transmission applications.
The substation is currently operational, indicating it is actively serving the local power grid.
As a US-based substation, it must comply with NERC reliability standards and FERC regulations, including requirements for grid stability, cybersecurity, and equipment maintenance.
A 161 kV substation typically serves as a transmission or sub-transmission node, stepping down voltage for distribution or interconnecting high-voltage lines to ensure reliable power delivery to urban and industrial areas.