Overview
Keene Road 115kV Substation is an operational electrical substation in Maine, United States, owned and operated by Versant Power. It plays a key role in regional grid stability.
Keene Road 115kV Substation is an operational electrical substation located in Maine, United States. Owned and operated by Versant Power, this facility operates at 115 kV, a standard transmission voltage level that supports medium-scale power distribution across the region. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), ensuring compliance with reliability standards for transmission-level assets. As part of Versant Power's network, it contributes to the resilience of Maine's electrical infrastructure, which serves a mix of urban and rural communities. This substation's 115 kV voltage level is critical for maintaining grid stability in the area, particularly given Maine's variable climate and seasonal energy demands. Its operational status supports local industrial, commercial, and residential electricity needs, reinforcing the reliability of the regional power supply.
Environmental context
The substation is situated in a region with a mix of forested and developed land, typical of rural Maine. Its 115 kV voltage level indicates a moderate scale of electrical infrastructure, balancing local grid demands with environmental considerations. The facility's location away from dense urban centers reduces immediate ecological impact, while its role in power distribution supports energy efficiency and grid reliability.
Frequently asked questions
Keene Road 115kV Substation is located in Maine, United States, at coordinates 45.394825, -68.529510.
Keene Road 115kV Substation operates at 115 kV, a standard transmission voltage for regional power distribution.
Keene Road 115kV Substation is owned and operated by Versant Power, a utility serving Maine.
As a US transmission asset, it must comply with NERC reliability standards and FERC regulations for grid stability and safety.
A 115 kV substation steps down transmission voltage for local distribution, ensuring reliable electricity supply to homes and businesses.