Risk: Medium Substation Operational

Kirkland Park Substation: 138 kV Electrical Substation in Dallas, Texas

United States

Overview

Kirkland Park Substation is an operational electrical substation in Dallas, Texas, United States, operating at 138 kV for grid stability.

Kirkland Park Substation is an operational electrical substation located in Dallas, Texas, United States. It operates at a voltage of 138 kV, classifying it as a high-voltage substation critical for regional power transmission and distribution. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), ensuring compliance with reliability standards for transmission-level assets. In Texas, the Electric Reliability Council of Texas (ERCOT) manages the grid, and this substation likely plays a role in maintaining grid stability within the ERCOT interconnection. As part of the Dallas metropolitan area's electrical infrastructure, Kirkland Park Substation supports the growing energy demands of a major urban center. Its operational status and voltage level indicate its importance in local power distribution, contributing to the reliability and resilience of the regional grid.

Environmental context

Located in an urban area of Dallas, Texas, the substation operates in a region with a hot semi-arid climate, where high summer temperatures drive peak electricity demand for air conditioning. The substation's 138 kV voltage level is typical for sub-transmission and distribution, balancing capacity and safety in a densely populated environment. Its urban setting necessitates careful management of electromagnetic fields and noise, while supporting the integration of renewable energy sources as Texas expands its wind and solar capacity.

Frequently asked questions

Kirkland Park Substation is located in Dallas, Texas, United States, at coordinates 32.892950, -96.763882.

Kirkland Park Substation operates at a voltage of 138 kV, which is typical for high-voltage sub-transmission and distribution substations.

The substation is subject to regulations by the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), and operates within the ERCOT grid in Texas.

A 138 kV substation steps down transmission-level voltage for distribution to industrial and residential areas, ensuring reliable power delivery and grid stability.

Yes, Kirkland Park Substation is listed as operational, indicating it is actively serving the Dallas area's electrical infrastructure.
UtilityRadar
More
Press Esc to close · Browse by sector