Overview
Lake Ruby Substation is an operational electrical substation in Florida, United States, operated by TECO. It handles voltages of 69 kV and 13 kV, serving the local grid.
Lake Ruby Substation is an operational electrical substation located in Florida, United States, and operated by TECO. The facility handles dual voltage levels of 69 kV and 13 kV, indicating its role in both transmission and distribution within the regional power grid. As part of the U.S. electrical infrastructure, the substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These standards ensure grid reliability and compliance with voltage regulation and protection schemes. The substation's voltage levels are typical for sub-transmission and distribution applications, serving industrial, commercial, and residential loads in the area. The substation plays a critical role in maintaining grid stability and power quality for the surrounding community. Its location in Florida, a state with growing energy demand and vulnerability to extreme weather, underscores the importance of robust infrastructure. TECO's operation of the facility aligns with regional utility practices for asset management and system resilience.
Environmental context
The substation is situated in a region with a subtropical climate, where high temperatures and humidity can affect equipment performance and longevity. Proximity to water bodies and wetlands may require careful stormwater management and wildlife protection measures. The facility's design likely incorporates measures to mitigate environmental impact, such as oil containment for transformers and noise reduction.
Frequently asked questions
Lake Ruby Substation is located in Florida, United States, at coordinates 27.981957, -81.661185.
Lake Ruby Substation handles voltages of 69 kV and 13 kV, serving both transmission and distribution functions.
Lake Ruby Substation is operated by TECO, a major utility company in Florida.
As part of the US electrical grid, Lake Ruby Substation must comply with NERC reliability standards and FERC regulations for grid stability and safety.
Substations like Lake Ruby transform voltage levels and route electricity between transmission and distribution networks, ensuring reliable power delivery to consumers.