Substation Operational

Lasher Road Station 3221 - National Grid 115 kV Substation, United States

United States

Overview

Lasher Road Station 3221 is an operational 115 kV substation owned by National Grid in the United States, supporting regional grid stability and power distribution.

Lasher Road Station 3221 is a substation located in the United States, owned and operated by National Grid. Operating at 115 kV, it is a medium-voltage facility that plays a role in the regional electrical infrastructure, stepping down transmission voltages for local distribution. As part of the U.S. electrical grid, this substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). It likely incorporates standard substation automation protocols such as IEC 61850 for monitoring and control, ensuring reliable power flow and grid stability. The facility's location in a rural or suburban area of New York State supports the surrounding community's electricity needs. Its operational status and connection to National Grid's network contribute to the resilience and capacity of the regional power system, serving residential, commercial, and industrial customers.

Environmental context

The substation is situated in a region with a temperate climate, where seasonal weather variations can impact grid operations. Its 115 kV voltage level indicates a role in local distribution, with potential environmental considerations related to electromagnetic fields and land use. The facility's design likely includes measures to minimize visual impact and ensure safe operation within the community.

Frequently asked questions

Lasher Road Station 3221 is located in the United States, near coordinates 42.977204, -73.930276, likely in New York State.

Lasher Road Station 3221 operates at 115 kV, a common voltage for subtransmission and distribution substations.

The substation is owned and operated by National Grid, a major utility company serving the northeastern United States.

As part of the U.S. grid, it must comply with NERC reliability standards and FERC regulations for transmission and distribution assets.

A 115 kV substation steps down high-voltage transmission power to lower voltages for local distribution, ensuring reliable electricity supply to homes and businesses.
UtilityRadar
More
Press Esc to close · Browse by sector