Overview
Lee County Solid Waste Substation is an operational 138 kV substation in Florida, USA, owned and operated by Florida Power & Light. It plays a key role in local grid stability.
Lee County Solid Waste Substation is an electrical substation located in Lee County, Florida, United States. Operated by Florida Power & Light, this facility operates at a voltage of 138 kV, classifying it as a medium-voltage substation that supports regional power distribution. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), ensuring compliance with reliability standards for transmission-level assets. As part of Florida Power & Light's network, it contributes to the robust electrical infrastructure serving the growing population and industrial activities in southwest Florida. Environmentally, the substation's location in a solid waste facility area highlights its role in supporting waste-to-energy or landfill operations, which are critical for sustainable waste management. Its operational status ensures continued grid reliability for the surrounding communities and industrial users.
Environmental context
Located within a solid waste facility, this substation likely supports waste-to-energy processes or landfill gas recovery, contributing to renewable energy integration. The 138 kV voltage level indicates a medium-scale substation that balances local distribution needs with grid stability. Its position in a waste management area underscores the intersection of electrical infrastructure and environmental sustainability.
Frequently asked questions
Lee County Solid Waste Substation is located in Lee County, Florida, United States, at coordinates 26.631586, -81.760994.
The substation operates at a voltage of 138 kV, which is typical for medium-voltage substations in the United States.
The substation is owned and operated by Florida Power & Light, a major electric utility in Florida.
As part of the US electrical grid, this substation must comply with NERC reliability standards and FERC regulations for transmission-level assets.
A 138 kV substation steps down high-voltage transmission power for local distribution, ensuring reliable electricity supply to residential, commercial, and industrial customers.