Overview
Lewis Run Substation is an operational electrical substation in Pennsylvania, United States, owned and operated by Pennsylvania Electric Company. It operates at a voltage of 230 kV, indicating a transmission-level facility.
Lewis Run Substation is an operational electrical substation located in Pennsylvania, United States. Owned and operated by Pennsylvania Electric Company, the facility operates at a voltage of 230 kV, classifying it as a high-voltage transmission substation critical for regional grid stability. As a transmission-level asset, Lewis Run Substation falls under the regulatory oversight of the Federal Energy Regulatory Commission (FERC) and must comply with North American Electric Reliability Corporation (NERC) reliability standards. The 230 kV voltage level is typical for bulk power transmission, connecting generation sources to distribution networks across the region. The substation plays a key role in the electrical infrastructure of northwestern Pennsylvania, supporting the local grid and ensuring reliable power delivery to residential, commercial, and industrial customers. Its operational status and voltage class underscore its importance in maintaining grid resilience and meeting regional energy demands.
Environmental context
The substation is located in a rural area of McKean County, Pennsylvania, characterized by forested hills and small communities. Its 230 kV transmission lines traverse natural landscapes, requiring vegetation management to prevent outages. The facility's operation aligns with grid reliability needs, with minimal direct environmental impact beyond land use for the substation footprint and transmission corridors.
Frequently asked questions
Lewis Run Substation is located in Pennsylvania, United States, near the community of Lewis Run in McKean County.
Lewis Run Substation operates at a voltage of 230 kV, which is a standard transmission-level voltage in the United States.
Lewis Run Substation is owned and operated by Pennsylvania Electric Company, a utility serving parts of Pennsylvania.
As a transmission substation in the US, Lewis Run Substation must comply with NERC reliability standards and FERC regulations for grid stability and security.
A 230 kV substation steps down high-voltage electricity from transmission lines to lower voltages for distribution, or interconnects transmission lines, playing a critical role in bulk power transfer and grid reliability.