Overview
Limerick 230 kV Substation is an operational electrical substation in the United States, operating at 230 kV and serving as a key node in the regional transmission grid.
Limerick 230 kV Substation is an operational electrical substation located in the United States, with coordinates 40.225606, -75.590108. It operates at a voltage of 230 kV, classifying it as a high-voltage substation critical for bulk power transmission and grid stability. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for transmission-level assets. As a 230 kV facility, it is typical of medium-to-high voltage substations that interconnect regional power systems and support load centers. This substation plays a vital role in the local electrical infrastructure, facilitating the efficient transmission of electricity from generation sources to distribution networks. Its operational status ensures continued reliability for the surrounding area, contributing to the overall resilience of the U.S. power grid.
Environmental context
The substation is located in a region with a mix of urban and rural areas, where electrical infrastructure must balance reliability with environmental considerations. High-voltage substations like this one are typically designed with minimal visual impact and incorporate measures to reduce electromagnetic field exposure. The surrounding landscape may include agricultural or residential zones, requiring careful siting to avoid ecological disruption.
Frequently asked questions
Limerick 230 kV Substation is located in the United States at coordinates 40.225606, -75.590108, near Limerick, Pennsylvania.
Limerick 230 kV Substation operates at a voltage of 230 kV, which is a standard high-voltage level for transmission substations in the United States.
The operator of Limerick 230 kV Substation is not publicly listed, but it is typically operated by a regional transmission utility or independent system operator under NERC and FERC regulations.
As a transmission-level substation in the United States, Limerick 230 kV Substation must comply with NERC reliability standards and FERC regulations, ensuring grid stability and operational safety.
A 230 kV substation steps down high-voltage electricity from transmission lines to lower voltages for distribution, or interconnects multiple transmission lines to enhance grid reliability and power flow management.