Risk: Low Substation Operational

Limon Wind Energy Center I Substation - 345 kV Substation in Colorado, United States

United States

Overview

Limon Wind Energy Center I Substation is an operational substation in Colorado, United States, owned and operated by NextEra Energy. It operates at 345 kV, supporting wind energy transmission.

Limon Wind Energy Center I Substation is a high-voltage substation located in Colorado, United States, owned and operated by NextEra Energy. The facility is operational and plays a key role in collecting and transmitting electricity from the Limon Wind Energy Center, a major renewable energy project. With a voltage level of 345 kV, it is classified as a transmission-level substation, critical for integrating wind power into the regional grid. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), ensuring compliance with reliability standards for bulk power systems. The 345 kV voltage indicates a large-scale facility typical of wind energy integration, requiring robust switchgear and automation systems. The substation likely employs modern protection and control systems, possibly adhering to IEC 61850 standards for substation automation. Environmentally, the substation supports the transmission of clean wind energy, contributing to reduced greenhouse gas emissions. Its location in rural Colorado aligns with the region's growing renewable energy infrastructure. The facility's operation is essential for grid stability and the delivery of renewable power to load centers, underscoring its significance in the transition to sustainable energy.

Environmental context

The substation is situated in a rural area of Colorado, a state with significant wind energy potential. Its operation facilitates the integration of renewable energy into the grid, reducing reliance on fossil fuels. The facility's high voltage level (345 kV) minimizes transmission losses, enhancing efficiency. The surrounding landscape is primarily agricultural, with minimal ecological disruption from the substation itself.

Frequently asked questions

Limon Wind Energy Center I Substation is located in Colorado, United States, near the town of Limon. Its coordinates are approximately 39.375240 N, -103.656413 W.

The substation operates at 345 kV, which is a high transmission voltage level used for efficient long-distance power transfer from wind farms to the grid.

The substation is owned and operated by NextEra Energy, a leading renewable energy company in the United States.

As part of the US bulk power system, the substation must comply with NERC reliability standards and FERC regulations. It likely follows IEC 61850 for substation automation.

The substation collects power from the Limon Wind Energy Center and steps it up to 345 kV for transmission, enabling the integration of wind energy into the regional grid.
UtilityRadar
More
Press Esc to close · Browse by sector