Overview
Limon Wind Energy Center II Substation is an operational 345 kV substation in Colorado, owned and operated by NextEra Energy. It supports wind energy transmission to the grid.
Limon Wind Energy Center II Substation is a high-voltage electrical substation located in Colorado, United States. It operates at 345 kV, a standard transmission voltage for bulk power transfer, and is owned and operated by NextEra Energy, a major renewable energy company. The substation is part of the Limon Wind Energy Center II, which integrates wind-generated electricity into the regional grid. The substation's 345 kV voltage level indicates its role in high-capacity transmission, connecting wind farms to the broader electrical network. In the United States, such facilities operate under NERC reliability standards and FERC regulation for transmission assets. The substation likely uses modern switchgear and automation systems compliant with ISO/IEC 61850 to ensure grid stability and efficient power flow. As a key node in a wind energy project, this substation facilitates the delivery of renewable energy to consumers, supporting Colorado's clean energy goals. Its location in a rural area with high wind resources underscores its importance in reducing carbon emissions and enhancing grid resilience. The facility contributes to local energy independence and regional electricity supply diversification.
Environmental context
Located in a rural area of Colorado, the substation supports wind energy transmission, reducing reliance on fossil fuels. The 345 kV voltage level is critical for grid stability, integrating variable renewable generation. The facility's operation aligns with state renewable portfolio standards, promoting low-carbon electricity. Its rural siting minimizes urban land-use conflicts while enabling clean energy export.
Frequently asked questions
The substation is located in Colorado, United States, near the town of Limon. Its coordinates are approximately 39.36°N, 103.59°W.
The substation operates at 345 kV, a standard high-voltage transmission level used for bulk power transfer from wind farms to the grid.
The substation is owned and operated by NextEra Energy, a leading renewable energy company in the United States.
As a transmission asset in the US, it must comply with NERC reliability standards and FERC regulations. It likely uses ISO/IEC 61850 for substation automation.
It connects the Limon Wind Energy Center II to the grid, enabling the transmission of wind-generated electricity to consumers and supporting Colorado's renewable energy goals.