Risk: Low Substation Operational

Lodi East Substation - 69 kV Electrical Substation in Lodi, Ohio, USA

United States

Overview

Lodi East Substation is an operational electrical substation in Lodi, Ohio, United States, operated by the Village of Lodi. It operates at a voltage of 69 kV, serving local grid stability.

Lodi East Substation is an operational electrical substation located in Lodi, Ohio, United States. The facility is owned and operated by the Village of Lodi, a municipal utility, and plays a key role in distributing electricity within the local community. As a substation operating at 69 kV, it falls within the sub-transmission voltage range typical for rural and small municipal grids. The substation operates under the regulatory framework of the United States, where the Federal Energy Regulatory Commission (FERC) oversees interstate electricity transmission, while the North American Electric Reliability Corporation (NERC) enforces reliability standards. At the municipal level, the Village of Lodi manages local distribution, ensuring compliance with state and federal grid codes. The 69 kV voltage level indicates a medium-scale substation that steps down power from higher transmission voltages for local distribution. Environmentally, the substation supports the electrical infrastructure of Lodi and surrounding areas, contributing to reliable power supply for residential, commercial, and agricultural users. Its location in rural Ohio means it is likely integrated with overhead transmission lines and serves as a critical node for grid stability in the region. The facility's operational status ensures continued service to the community, with no reported environmental impacts from its operation.

Environmental context

The substation is located in a rural area of Ohio, where the surrounding landscape is primarily agricultural and residential. Its operation involves electromagnetic fields and potential noise from transformers, but standard mitigation measures are in place. The facility's 69 kV voltage level is typical for sub-transmission substations, which have a moderate environmental footprint compared to higher-voltage installations.

Frequently asked questions

Lodi East Substation is located in Lodi, Ohio, United States, at coordinates 41.026006, -81.996247.

Lodi East Substation operates at a voltage of 69 kV, which is typical for sub-transmission substations serving local distribution networks.

Lodi East Substation is owned and operated by the Village of Lodi, a municipal utility in Ohio.

Substations in the United States must comply with NERC reliability standards for grid stability and FERC regulations for interstate transmission. Local utilities also follow state public utility commission rules.

A 69 kV substation steps down higher transmission voltages (e.g., 138 kV or 230 kV) to distribution levels (e.g., 12 kV or 34.5 kV) for local delivery to homes and businesses.
UtilityRadar
More
Press Esc to close · Browse by sector