Overview
Lorton Substation is an operational electrical substation in the United States, operating at 230 kV. It plays a key role in regional grid stability and power distribution.
Lorton Substation is an operational electrical substation located in the United States, with coordinates 38.694999, -77.260786. Operating at a voltage of 230 kV, it is classified as a high-voltage substation, critical for transmitting electricity over long distances and ensuring grid reliability. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce standards for bulk power system reliability. As a 230 kV facility, it is typical of transmission-level infrastructure that interconnects generation sources with distribution networks, supporting the robust electrical grid in the region. Lorton Substation contributes to the electrical infrastructure serving the surrounding communities and industries. Its operational status ensures continued support for local power demands and grid stability. The facility's location in the United States places it within one of the world's largest and most complex electrical networks, emphasizing its importance in maintaining reliable electricity supply.
Environmental context
The substation is situated in a region with a mix of urban and suburban development, typical of the Mid-Atlantic United States. Its 230 kV voltage level indicates a significant role in the transmission grid, which can influence land use and ecological corridors. Substations of this scale often require cleared rights-of-way, which can affect local habitats, but they are generally designed to minimize environmental impact through siting and mitigation measures.
Frequently asked questions
Lorton Substation is located in the United States at coordinates 38.694999, -77.260786, serving the Lorton area and surrounding regions.
Lorton Substation operates at 230 kV, which is a high-voltage level used for transmission of electricity over long distances.
Lorton Substation is currently operational, actively contributing to the electrical grid.
As a US substation, Lorton Substation must comply with NERC reliability standards and FERC regulations to ensure grid stability and security.
A 230 kV substation is a transmission-level facility that steps down voltage from higher levels for distribution or interconnects transmission lines, playing a critical role in bulk power transfer and grid reliability.