Substation Operational

Loyola Substation - Operational Substation in Texas, United States

United States

Overview

Loyola Substation is an operational electrical substation in Texas, United States, owned by American Electric Power. It operates at 138 kV and 69 kV, serving the local grid.

Loyola Substation is an operational electrical substation located in Texas, United States. Owned by American Electric Power, it plays a role in the regional transmission and distribution network. The substation operates at voltage levels of 138 kV and 69 kV, indicating its function in stepping down power for local distribution. As part of the U.S. electrical infrastructure, Loyola Substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These bodies enforce reliability standards and oversee interstate electricity transmission. The substation's voltage levels are typical for sub-transmission and distribution, connecting high-voltage transmission lines to lower-voltage distribution networks. The substation's location in Texas places it within the Electric Reliability Council of Texas (ERCOT) grid, which manages the majority of the state's power. Its operational status ensures continued support for local electricity demand, contributing to grid stability and reliability for surrounding communities.

Environmental context

The substation is located in a rural area of southern Texas, near the Gulf Coast. The region's flat terrain and coastal climate influence infrastructure design, with considerations for hurricane resilience and corrosion resistance. The substation's voltage levels and equipment age are typical for facilities supporting agricultural and small urban loads.

Frequently asked questions

Loyola Substation is located in Texas, United States, near coordinates 27.3185, -97.8101.

Loyola Substation is owned by American Electric Power, a major utility company in the United States.

Loyola Substation operates at 138 kV and 69 kV, typical for sub-transmission and distribution substations.

Substations in the U.S. must comply with NERC reliability standards and FERC regulations for transmission assets, as well as local grid operator requirements like those of ERCOT in Texas.

Substations like Loyola step down high-voltage electricity from transmission lines to lower voltages for distribution to homes and businesses, ensuring grid stability and reliability.
UtilityRadar
More
Press Esc to close · Browse by sector