Overview
Mallard Substation is an operational electrical substation in the United States, operating at 115 kV. It plays a role in regional grid stability and power distribution.
Mallard Substation is an operational electrical substation located in the United States, with coordinates 48.217925, -101.188878. The facility operates at a voltage of 115 kV, classifying it as a high-voltage substation critical for transmitting electricity from generation sources to distribution networks. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for the bulk power system. As a 115 kV facility, it is typical of sub-transmission or distribution-level infrastructure that supports local grid connectivity and load serving. Environmentally, the substation's location in a rural area suggests lower population density, reducing immediate community exposure to electromagnetic fields. Its operational status indicates ongoing contribution to grid reliability, supporting residential, agricultural, or industrial loads in the region.
Environmental context
The substation is situated in a rural area of the United States, where the surrounding landscape is likely agricultural or undeveloped. The 115 kV voltage level indicates moderate electromagnetic field emissions, which are regulated by state and federal guidelines. The facility's rural location reduces potential impacts on densely populated areas, while its role in power distribution supports local energy needs without significant environmental disruption.
Frequently asked questions
Mallard Substation is located in the United States at coordinates 48.217925, -101.188878, in a rural area.
Mallard Substation operates at 115 kV, which is a common voltage for sub-transmission and distribution substations.
Mallard Substation is currently operational, meaning it is actively used for electricity transmission and distribution.
As a US substation, Mallard Substation must comply with NERC reliability standards and FERC regulations for grid stability and safety.
A 115 kV substation typically steps down voltage from transmission lines to distribution levels, serving local communities and industries.