Overview
Mannville Substation #63 CLAY is an operational electrical substation in Florida, United States, operating at 115 kV. It plays a role in regional grid stability and power distribution.
Mannville Substation #63 CLAY is an operational electrical substation located in Florida, United States, near coordinates 29.627835, -81.834898. The facility operates at a voltage of 115 kV, classifying it as a medium-voltage substation typical of distribution-level infrastructure in the region. As a substation in the United States, this facility operates under regulatory frameworks established by the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These standards ensure grid reliability and compliance with voltage regulation and protection schemes. The 115 kV voltage level is common for sub-transmission systems that connect bulk power to local distribution networks. The substation's location in rural Florida supports the electrical infrastructure for surrounding communities and industries. Its operational status contributes to the resilience of the local grid, facilitating power flow and voltage control. The facility is part of a broader network that ensures reliable electricity supply to residential, commercial, and agricultural users in the area.
Environmental context
The substation is situated in a rural area of Florida, characterized by flat terrain and a humid subtropical climate. The region is prone to lightning strikes and tropical storms, which can impact electrical infrastructure. The facility's design likely includes surge protection and weather-resistant equipment to mitigate these risks. Its location away from dense urban centers reduces exposure to certain environmental stressors but requires robust maintenance to ensure long-term reliability.
Frequently asked questions
Mannville Substation #63 CLAY is located in Florida, United States, near coordinates 29.627835, -81.834898.
Mannville Substation #63 CLAY operates at 115 kV, a common voltage for sub-transmission and distribution substations.
The substation is currently operational, as indicated by its status in the database.
In the United States, substations must comply with NERC reliability standards and FERC regulations, which cover grid stability, voltage control, and protection systems.
A 115 kV substation typically serves as a sub-transmission node, stepping down voltage from higher transmission levels to distribution levels for local power delivery.