Risk: Medium Substation Operational

Maximo Substation: 115 kV Electrical Substation in Florida, Operated by Duke Energy

United States

Overview

Maximo Substation, operated by Duke Energy, is a 115 kV electrical substation located in Florida, United States. It plays a key role in regional grid stability and power distribution.

Maximo Substation is an operational electrical substation located in Florida, United States, and operated by Duke Energy. With a voltage level of 115 kV, it is classified as a medium-voltage substation, serving as a critical node in the local transmission and distribution network. The facility is part of Duke Energy's extensive infrastructure portfolio in the region, supporting residential, commercial, and industrial electricity demand. Operating under the regulatory oversight of the Federal Energy Regulatory Commission (FERC) and the North American Electric Reliability Corporation (NERC), Maximo Substation adheres to mandatory reliability standards. The 115 kV voltage level is typical for sub-transmission and distribution substations, which step down power from higher voltage transmission lines for local distribution. The substation likely employs modern switchgear and protection systems compliant with industry standards such as IEEE C37. As part of the Florida grid, Maximo Substation contributes to the resilience and reliability of electricity supply in the Tampa Bay area. Its coastal location near St. Petersburg requires robust design to withstand hurricane conditions and saltwater corrosion. The substation supports Duke Energy's commitment to grid modernization and integration of renewable energy sources, ensuring stable power delivery to the community.

Environmental context

Located in a coastal urban area of Florida, Maximo Substation operates in a region prone to hurricanes and tropical storms, necessitating resilient infrastructure design. The substation's 115 kV equipment is designed to withstand high winds and flooding, with corrosion-resistant materials used for longevity. The surrounding environment includes residential and commercial zones, requiring careful management of electromagnetic fields and noise. Duke Energy implements vegetation management and stormwater controls to minimize ecological impact.

Frequently asked questions

Maximo Substation is located in Florida, United States, near St. Petersburg in Pinellas County. Its approximate coordinates are 27.72744 N, -82.67585 W.

Maximo Substation operates at 115 kV, which is a common voltage level for sub-transmission and distribution substations in the United States.

Maximo Substation is operated by Duke Energy, one of the largest electric power holding companies in the United States, serving millions of customers in the Southeast and Midwest.

Substations in the United States must comply with NERC reliability standards for grid stability and FERC regulations for interstate transmission. Additionally, IEEE standards such as C37 for switchgear and C2 for safety are typically followed.

Maximo Substation steps down high-voltage transmission power to distribution levels, serving residential and commercial customers in the Tampa Bay area. It also enhances grid reliability by providing redundancy and voltage support.
UtilityRadar
More
Press Esc to close · Browse by sector