McClelland Substation is an operational electrical substation in the United States, operating at 345 kV. It plays a key role in high-voltage transmission grid stability.

McClelland Substation is an operational electrical substation located in the United States, with coordinates 40.992476, -80.438210. The facility operates at a voltage of 345 kV, classifying it as a high-voltage transmission substation critical for regional grid stability. The substation's 345 kV voltage level indicates its role in the bulk power transmission system, connecting major generation sources to load centers. In the United States, such facilities are subject to NERC reliability standards and FERC regulation, ensuring grid security and operational compliance. The substation likely includes modern switchgear and automation systems adhering to ISO/IEC 61850 standards. As a high-voltage substation, McClelland Substation supports the reliable delivery of electricity to surrounding communities and industries. Its operational status ensures continued grid resilience, particularly in the context of the regional energy mix and demand patterns. The facility's location in the northeastern US contributes to the interconnected power system's overall stability.

Environmental context

The substation's location in the northeastern United States places it within a region with diverse environmental conditions, including seasonal temperature extremes and variable precipitation. High-voltage substations like this one are typically designed with environmental safeguards such as oil containment systems for transformers and noise mitigation measures. The facility's operation aligns with grid reliability requirements while minimizing local ecological impact through standard industry practices.

Frequently asked questions

McClelland Substation is located in the United States at coordinates 40.992476, -80.438210, likely in the northeastern region.

McClelland Substation operates at 345 kV, a high-voltage level used for bulk power transmission across the grid.

It is likely managed by a regional transmission utility or independent system operator.

In the United States, high-voltage substations must comply with NERC reliability standards and FERC regulations, ensuring grid security and operational integrity.

A 345 kV substation interconnects major transmission lines, allowing efficient power transfer and voltage regulation, which is essential for maintaining grid stability and preventing outages.