Overview
Medusa Portland Cement Substation #2 is an operational substation in Georgia, United States, operated by Georgia Power. It operates at 46 kV, serving the local grid.
Medusa Portland Cement Substation #2 is an operational electrical substation located in Georgia, United States. Owned and operated by Georgia Power, a major utility in the region, this facility plays a role in the state's electrical infrastructure. The substation operates at a voltage of 46 kV, which is typical for distribution-level substations that step down power from transmission lines to serve industrial and residential customers. Georgia Power operates under the regulatory oversight of the Georgia Public Service Commission and must comply with NERC reliability standards to ensure grid stability. The substation's 46 kV voltage level indicates it is part of the distribution network, likely serving local industrial facilities such as the nearby Medusa Portland Cement plant. Substations of this scale are critical for maintaining reliable power supply to specific industrial customers and surrounding areas. The environmental context of this substation includes its location in a region with a mix of industrial and rural land use. Substations like this one are designed to minimize visual and environmental impact, often using enclosed switchgear and noise mitigation measures. The facility's role in supporting industrial operations underscores its importance to the local economy and energy reliability.
Environmental context
Located in a region with industrial and rural land use, this substation operates at 46 kV, typical for distribution-level infrastructure. Its design includes standard environmental mitigations such as noise barriers and oil containment to prevent soil and water contamination. The facility's proximity to industrial customers highlights its role in supporting local economic activity while adhering to environmental regulations.
Frequently asked questions
Medusa Portland Cement Substation #2 is located in Georgia, United States, near the Medusa Portland Cement plant. The exact coordinates are 32.405380, -83.641699.
The substation operates at a voltage of 46 kV, which is a standard distribution-level voltage in the United States.
The substation is owned and operated by Georgia Power, a subsidiary of Southern Company and a major electric utility in the state.
Substations in the United States must comply with NERC reliability standards for grid stability and FERC regulations for transmission-level assets. State-level public service commissions also oversee distribution infrastructure.
A 46 kV substation typically steps down transmission voltage to distribution levels, serving industrial customers and local distribution networks. It is critical for reliable power delivery to specific areas.