Substation Operational

Medusa Portland Cement Substation #3 - 46 kV Substation in the United States

United States

Overview

Medusa Portland Cement Substation #3, operated by Georgia Power in the United States, is a 46 kV substation supporting industrial power distribution.

Medusa Portland Cement Substation #3 is an operational electrical substation located in the United States, specifically serving the Medusa Portland Cement facility. Operated by Georgia Power, this substation plays a critical role in delivering reliable electricity to industrial operations. With a voltage level of 46 kV, it is classified as a medium-voltage substation, typical for industrial and commercial power distribution. As part of the U.S. electrical grid, this substation operates under the regulatory framework established by the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These standards ensure grid stability and reliability through mandatory compliance with reliability standards. The substation likely incorporates modern automation and protection systems, such as those based on IEC 61850, to enhance operational efficiency and safety. The substation's location in the southeastern United States places it within a region with a robust electrical infrastructure, supporting diverse industries including cement manufacturing. Its role in powering a cement plant underscores its importance to local economic activity. The facility's operational status and connection to the broader grid contribute to the resilience of the regional power supply.

Environmental context

The substation is situated in a rural area of Georgia, where the local environment is characterized by mixed forest and agricultural land. Electrical infrastructure in such settings must consider potential impacts on wildlife and vegetation, particularly during construction and maintenance. The 46 kV voltage level indicates a moderate footprint, with typical measures to minimize electromagnetic field exposure and ensure safe operation near natural habitats.

Frequently asked questions

Medusa Portland Cement Substation #3 is located in the United States, near the Medusa Portland Cement facility in Georgia. The exact coordinates are 32.396652 N, -83.665946 W.

The substation operates at a voltage of 46 kV, which is typical for industrial power distribution in the United States.

The substation is operated by Georgia Power, a major electric utility serving the state of Georgia.

As part of the U.S. electrical grid, this substation must comply with NERC reliability standards and FERC regulations, ensuring grid stability and security.

A 46 kV substation typically steps down transmission voltage for distribution to industrial or large commercial customers, playing a key role in delivering reliable power to end users.