Overview
Mescalero Sub is an operational electrical substation located in the United States. It operates at a voltage of 115 kV, serving regional grid stability.
Mescalero Sub is an operational electrical substation located in the United States, with coordinates 33.271279, -105.707761. The facility operates at a voltage of 115 kV, classifying it as a high-voltage substation critical for regional power transmission and distribution. As a substation in the United States, Mescalero Sub operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These bodies enforce reliability standards for transmission-level assets, ensuring grid stability and compliance with voltage and frequency requirements. The 115 kV voltage level is typical for sub-transmission or distribution substations, serving as a link between high-voltage transmission lines and local distribution networks. The substation plays a key role in the local electrical infrastructure, supporting the surrounding community's power needs. Its operational status indicates ongoing contribution to grid reliability, with potential integration into regional interconnections. The facility's location in the United States places it within one of the world's largest and most complex power grids, subject to stringent operational and environmental standards.
Environmental context
The substation is situated in a rural area of the United States, likely surrounded by natural landscapes. Electrical infrastructure at this voltage level can have localized environmental impacts, such as electromagnetic fields and land use for transmission corridors. The facility's operation is subject to environmental regulations that mitigate effects on local ecosystems and wildlife.
Frequently asked questions
Mescalero Sub is located in the United States at coordinates 33.271279, -105.707761. It serves the regional electrical grid.
Mescalero Sub operates at a voltage of 115 kV, which is typical for sub-transmission or distribution substations in the United States.
Mescalero Sub is currently operational, meaning it is actively contributing to the electrical grid's stability and power distribution.
Substations in the United States must comply with NERC reliability standards and FERC regulations, which ensure grid stability, voltage control, and protection against outages.
A 115 kV substation typically serves as a link between high-voltage transmission lines (e.g., 230 kV or higher) and lower-voltage distribution networks, stepping down voltage for local use and ensuring reliable power delivery.