Risk: Low Substation Operational

Mike Doneen Substation - Operational Electrical Substation in Washington, US

United States

Overview

Mike Doneen Substation is an operational electrical substation in Washington State, United States, owned and operated by Douglas County PUD. It plays a key role in local grid stability and power distribution.

Mike Doneen Substation is an operational electrical substation located in Washington State, United States. Owned and operated by Douglas County PUD, the facility is part of the regional electrical infrastructure that supports power transmission and distribution across the area. As a substation, this facility operates within the regulatory framework of the United States, adhering to NERC reliability standards and FERC regulations for grid stability. Substations like this one typically handle voltage levels ranging from 69 kV to 230 kV, serving as critical nodes in the power network. The facility's location in Washington State places it within a region with a mix of hydroelectric, natural gas, and renewable energy generation. The substation's operational status ensures continued service to the local community, contributing to the reliability of the electrical grid. Douglas County PUD, a public utility district, manages the facility to meet the energy needs of its customers, supporting both residential and industrial demand in the area.

Environmental context

The substation is situated in a region with diverse environmental conditions, including proximity to the Columbia River and surrounding agricultural lands. Electrical infrastructure in this area must consider wildfire risk, especially during dry seasons, and comply with environmental regulations to minimize impact on local ecosystems. The facility's design and operation incorporate standard practices for oil containment and vegetation management.

Frequently asked questions

Mike Doneen Substation is located in Washington State, United States, at coordinates 47.449077, -120.265070.

Mike Doneen Substation is owned and operated by Douglas County PUD, a public utility district serving the region.

Substations like Mike Doneen are critical nodes in the electrical grid, stepping voltage up or down for transmission and distribution, and ensuring reliable power delivery to homes and businesses.

US substations must comply with NERC reliability standards for grid stability and FERC regulations for interstate transmission. They also follow IEEE and ISO/IEC 61850 standards for automation and protection.

Douglas County PUD maintains its substations through regular inspections, adherence to NERC standards, and investments in modern equipment to minimize outages and improve efficiency.
UtilityRadar
More
Press Esc to close · Browse by sector