Risk: Medium Substation Operational

Morse Road Substation - 138 kV Operational Substation in the United States

United States

Overview

Morse Road Substation is an operational electrical substation in the United States, operating at 138 kV. It plays a role in regional grid stability and power distribution.

Morse Road Substation is an operational electrical substation located in the United States, with coordinates 40.061189, -82.907143. The facility operates at a voltage of 138 kV, classifying it as a high-voltage substation critical for transmission and distribution within the regional power grid. The substation operates under the regulatory framework of the United States, which includes NERC reliability standards and FERC oversight for transmission-level assets. At 138 kV, this facility is typical of sub-transmission or distribution substations that serve urban or suburban areas, ensuring reliable power delivery to residential, commercial, and industrial customers. As part of the electrical infrastructure, Morse Road Substation contributes to grid resilience and load balancing. Its operational status indicates ongoing service to the local community, supporting economic activity and daily life. The facility's location and voltage level underscore its importance in maintaining stable electricity supply in the region.

Environmental context

The substation's operation involves electromagnetic fields and potential impacts on local wildlife, though modern designs mitigate these effects. Its urban or suburban setting likely integrates with existing land use, and its 138 kV voltage level is typical for distribution networks that minimize visual and environmental footprint compared to higher-voltage transmission lines.

Frequently asked questions

Morse Road Substation is located in the United States at coordinates 40.061189, -82.907143.

Morse Road Substation operates at a voltage of 138 kV, which is typical for sub-transmission and distribution substations.

As a US electrical substation, Morse Road Substation must comply with NERC reliability standards and FERC regulations for grid stability and safety.

Morse Road Substation is currently operational, meaning it is actively serving the power grid.

A 138 kV substation typically steps down voltage from transmission lines to distribution levels, serving local communities and industries with reliable electricity.
UtilityRadar
More
Press Esc to close · Browse by sector