Risk: Low Substation Operational

Mosier Substation - Operational Distribution Substation in the United States

United States

Overview

Mosier Substation is an operational electrical substation in the United States, owned and operated by FirstEnergy. It operates at a voltage of 23 kV, serving the local grid.

Mosier Substation is an operational electrical substation located in the United States, owned and operated by FirstEnergy. The facility operates at a voltage of 23 kV, classifying it as a distribution-level substation that steps down transmission voltages for local distribution. As part of the U.S. electrical infrastructure, Mosier Substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These bodies enforce reliability standards for grid stability and ensure compliance with voltage regulation and maintenance protocols. The substation likely employs modern switchgear and automation systems in line with industry standards. The substation plays a critical role in the local power distribution network, ensuring reliable electricity supply to residential, commercial, and industrial customers in the surrounding area. Its operation supports grid stability and contributes to the overall resilience of the regional electrical infrastructure.

Environmental context

The substation is located in an urban or suburban area, where electrical infrastructure is integrated into the built environment. The 23 kV voltage level indicates a distribution substation, which typically has a smaller environmental footprint than high-voltage transmission substations. The site is likely designed with containment measures for potential oil leaks from transformers and may include noise mitigation features. The surrounding area may have mixed land use, including residential and commercial zones.

Frequently asked questions

Mosier Substation is located in the United States, with coordinates approximately 41.141454 N, -80.691847 W.

Mosier Substation operates at a voltage of 23 kV, which is typical for a distribution-level substation that supplies power to local customers.

Mosier Substation is owned and operated by FirstEnergy, a major electric utility company serving customers in the United States.

Substations in the United States must comply with NERC reliability standards and FERC regulations, which cover grid stability, voltage control, and equipment maintenance.

A distribution substation steps down voltage from transmission levels to lower voltages suitable for local distribution, ensuring reliable electricity supply to homes and businesses.
UtilityRadar
More
Press Esc to close · Browse by sector