Overview
New Creek Wind Substation is an operational electrical substation in the United States, handling a voltage of 500 kV. It supports grid integration of wind energy in the Appalachian region.
New Creek Wind Substation is an operational electrical substation located in the United States, with coordinates 39.200031, -79.140713. The facility operates at a voltage of 500 kV, classifying it as a high-voltage substation critical for bulk power transmission. This voltage level is typical for connecting large-scale renewable energy projects to the national grid. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for transmission-level assets. As a 500 kV facility, it likely employs advanced switchgear and automation systems compliant with standards such as ISO/IEC 61850 for substation automation, ensuring efficient and reliable power flow. New Creek Wind Substation plays a key role in integrating wind-generated electricity from the New Creek Wind project into the broader grid. Its location in a rural, mountainous area of West Virginia supports the region's transition to renewable energy sources, contributing to grid stability and reducing carbon emissions. The substation's high voltage capacity enables efficient long-distance power transmission to load centers.
Environmental context
The substation is situated in a rural, forested area of the Appalachian Mountains, where wind energy development is expanding. The high voltage of 500 kV allows for efficient transmission over long distances, minimizing line losses. The facility's operation supports the displacement of fossil fuel generation, contributing to regional air quality improvements and greenhouse gas reduction goals.
Frequently asked questions
New Creek Wind Substation is located in the United States, with approximate coordinates 39.200031, -79.140713, in a rural area of West Virginia.
New Creek Wind Substation operates at a voltage of 500 kV, which is a high-voltage level used for bulk power transmission and integration of large-scale renewable energy projects.
New Creek Wind Substation is currently operational, serving as a key node for transmitting wind-generated electricity to the grid.
In the United States, substations like New Creek Wind must comply with NERC reliability standards and FERC regulations for transmission assets. Additionally, automation systems often follow ISO/IEC 61850 standards.
New Creek Wind Substation facilitates the integration of wind energy into the regional grid, enhancing renewable energy capacity and supporting grid stability in the Appalachian region.