Risk: Low Substation Operational

NEW GLARUS Substation - Wisconsin, United States Electrical Infrastructure

United States

Overview

NEW GLARUS is an operational electrical substation in Wisconsin, United States, operating at 69 kV. It plays a role in regional power distribution and grid stability.

NEW GLARUS is an operational electrical substation located in Wisconsin, United States. The facility operates at a voltage of 69 kV, which classifies it as a sub-transmission or distribution-level asset within the electrical infrastructure network. Substations at this voltage level typically serve to step down power from higher transmission voltages for local distribution or to interconnect regional grids. Operating within the United States, this substation falls under the regulatory oversight of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC) for reliability standards. The facility likely adheres to NERC's Critical Infrastructure Protection (CIP) standards and may be subject to state-level utility regulations. Substations of this scale are common in rural and suburban areas, supporting local load centers and renewable energy integration. The substation's location in Wisconsin places it within the Midcontinent Independent System Operator (MISO) footprint, which manages the regional transmission grid. Its operational status indicates it is actively contributing to grid reliability and power delivery to nearby communities. The facility's role in voltage regulation and power flow control is essential for maintaining stable electrical service in the region.

Environmental context

The substation is situated in a rural area of Wisconsin, surrounded by agricultural land and small communities. Its 69 kV voltage level suggests it serves local distribution needs, with potential environmental considerations including electromagnetic field (EMF) exposure and land use impacts. The facility's operation aligns with typical substation practices for minimizing ecological disruption through proper siting and maintenance.

Frequently asked questions

The NEW GLARUS substation is located in Wisconsin, United States, near the coordinates 42.803704, -89.622987.

The NEW GLARUS substation operates at a voltage of 69 kV, which is typical for sub-transmission and distribution applications.

As a US electrical asset, the substation is subject to NERC reliability standards and FERC regulations, and it operates within the MISO regional transmission organization.

A 69 kV substation typically steps down higher transmission voltages for local distribution, interconnects renewable energy sources, or provides voltage support to maintain grid stability.

Environmental considerations include electromagnetic field management, noise mitigation from transformers, and land use planning to minimize impact on surrounding ecosystems.